Language: Chineseline English

Company News

Quality assurance and after-sales service of Fengyong Sheng

Product Description:
Mechanical size: 900 & times; 460 & times; 1650 (mm) & nbsp; rivet diameter: & phi; 3-8 (mm)
Working height: 950mm) Rivet length: 10-70 (mm)  Throat depth: 310 (mm)
Horsepower: 3/4 (HP) Power: 380V
Motor speed: 1450RPM   Net weight: 300(kg)

Riveting machine use:
Suitable for strollers, sports equipment, furniture, bicycle accessories, lounge chairs, reclining chairs and hardware industries.

Quality assurance and after-sales service of the riveting machine:
One. Quality Assurance Task Range
Xinneng's engineering design, production, commissioning and service are all carried out in the quality system mode. With Xinneng's engineering strength and years of engineering experience, and through the ISO9001 quality system demonstration, CE certification, Xin can ensure that the machinery and equipment purchased by your company are implemented with the best quality requirements and management.

Two. Quality Assurance Scope:
1. Company leaders fully participate in the establishment, implementation, and continuous improvement of a flexible and effective quality system;
2. Full training and development of personnel;
3. The combination of prevention and improvement for quality control of product development, production, sales, service, etc.;
4. Continuously improve product technology, develop high-tech products, and extend quality assurance to the final stage of the product;
5. Guaranteed implementation according to plan and procedures, and continuous evaluation and verification during the implementation process.

Three. Quality certificate management method:
In the product development and development. Procurement. Production process. Check and test. Installation and operation. Technical service and maintenance in six aspects in strict accordance with quality inspection to ensure implementation.
A. Product design. Development control
Hardware development work includes feasibility analysis, overall design, detailed design, experiment, debugging small batch production, production technical specification, technical file summary and subsequent development plan, etc.;
Software system development includes feasibility analysis, overall design, detailed design, system analysis, system design, programming, testing of commodities, technical summary and subsequent development plans, etc.;
Product development file management and confidentiality work is the overall responsibility of the company's chief engineer, and is responsible for collecting the company;
Development files include stage work files and technical results files;
At each stage of product development, a meeting review should be organized and the review records kept by the Administration.
B. Procurement control
1. Select suppliers based on their supplier's performance and their proven record of quality assurance capabilities to ensure they are able to provide products or tasks that meet contractual requirements;
2. When the demander or other representative needs to carry out inspections at the company's supplier, the company's special person is responsible for matching the inspection of the demander to ensure that the quality requirements of the buyer are met.
C. Control of customer property
According to the requirements of the contract agreement, the customer's property for the customer to use or incorporate into the product shall be identified, verified, protected and maintained to ensure that the customer's product meets the specified requirements and that the correct method of use is obtained.
D. Production program control
1. The production process should be carried out under controlled conditions. When production quality is abnormal, it is necessary to analyze in time and formulate effective improvement measures;
2. Control the quality of the incoming material and ask the supplier to provide documentation to verify the quality of the incoming material.
E. Inspection, test control
1. The company's quality inspection department is responsible for approving inspection procedures to ensure that all types of materials or products pass the required inspection and testing;
2. Regularly inspect equipment and measuring instruments;
3. After the finished product is packaged, the quality inspectors shall carry out the final inspection and testing of the finished product according to the inspection standard and inspection plan, and the products after inspection shall be allowed to be put into storage and sales;
F. Construction installation control
1. The company has a strong team of after-sales installers;
2. Have reliable and complete construction equipment and transportation;
3. Develop a scientific and rigorous installation inspection and inspection management system.
G. Technical service and maintenance control
1. The company's certificate provides customers with good technical advice, accessories and maintenance services in accordance with the requirements of the contract, and maintains complete records and customer tracking;
2. The user issues or the quality problems in progress are returned to the relevant departments by the after-sales service personnel, and corrective measures are taken in time;
3. When the contract has special requirements, provide after-sales service according to the relevant provisions of the contract, and satisfy the customer's requirements to the utmost extent.
Fourth, after-sales service commitment:
1. After the equipment is sold, the whole machine will be repaired free of charge during the year, and after-sales service will be provided for life (excluding consumables).
2. Equipment quality problems, our company will be on-site service within 24 hours (domestic).
3. Long-term free technical consultation and provide the best mold making program.

新闻中心

Contact Us

CONTACT US

Contact:Mr. Ye

Mobile:13862602473

Tel:13826962383

Email:1227949331@qq.com

Address:1768 Huaan Road, Huaqiao Town, Kunshan, Kunshan, Jiangsu, China